Calendar

January 2019
S M T W T F S
« Apr    
 12345
6789101112
13141516171819
20212223242526
2728293031  

BUTOKUDEN Dojo
1581 Browning
Irvine CA 92606 USA
Phone: 866-DO-KENDO

Placing the sleepers and the plywood over the vinyl sheet

Once the vinyl sheet is placed, then the sleeper plywood is placed over the sheet 1 feet apart. Then the plywood is stapled on to the sleeper. The sleeper is free over the concrete.

BUTOKUDEN Kendo Dojo Floor Construction

First a thick vinyl sheet was placed over the concrete, in order to keep the humidity from the floor to come up into the floor wood.

The first layer that comes on top of the vinyl sheet is the sleeper plywood (3/4 inches thick, 6 inches wide), with a special rubber on the bottom.

BUTOKUDEN Kendo Dojo Floor Construction has Started

We first painted the walls before we started the floor construction.

BUTOKUDEN Kendo Dojo Floor Materials are arriving!

The material for the Dojo floor has started to arrive.
This is the material that is going to go on the top layer. It is Canadian maple. The smell of the wood is very nice!