We have to also cut the asphalt on the parking lot to connect the sewer line to the new bathroom and kitchen on the Dojo side.
|
||||
We have to also cut the asphalt on the parking lot to connect the sewer line to the new bathroom and kitchen on the Dojo side. This is the wall that separates the Dojo and the warehouse. Now that the wall is up, the space feels smaller…
We have started building the separation wall between the Dojo and the warehouse. This wall needs to be an “1 hour wall”, i.e. in case of a fire, the fire will not go from one side to the other. I have searched in Google Maps, and this is where our new building is located. This is the official location for E-BOGU.COM and BUTOKDEN Dojo. |
||||
Copyright © 2021 The making of a Kendo Dojo - All Rights Reserved |