These stairs was added to the plan, because for fire safety purposes, we have to have an additional stair going to the second floor.
|
||||
The first floor framing is almost done. Now they are moving into the second floor. The framing started, and this seems to go fast. Now that the foundation is done, the next step is to do the rough construction. A lot of lumber material has arrived today. The foundation for the building is almost done. They have put the steel bars, and poured the concrete. I personally do not think that we need an A/C system in a Kendo Dojo, specially here in Southern California. However, the California building code requires us to have a heater. Since, the price of a heater only system and a heat/cold air system is not much different, we decided to go with the dual one. We are very spoiled. We have 4 huge A/C system for this Dojo. It took them two whole days to drill 4 holes on this concrete wall. On the parking lot side, the digging continues. This is to connect the drain to the sewer. |
||||